CMP orders

CMP orders

CMP orders

Already in 1990, forward-looking CMP (then KFS – Københavns Frihavns- og Stevedoreselskab) purchased
their first diesel-electric Gottwald mobile harbour crane. At the time, it was the world’s strongest, lifting 120
tons at 23 m. Equipped with a 6.3 kV external power connection, it used clean electric power.
The two new cranes, each have 125 tons lifting capacity at 20 m radius. Designated G HMK 6507B, they are
versatile machines, designed for dedicated 4-rope bulk operation, as well as for professional container and
heavy lift handling. The cranes will be externally powered through a 10 kV electrical power supply.

See pdf